Rename a sheet in Google Sheets
Rename the Practice sheet to Quarterly Plan. Do not change any values.
Verified by JosephineAbout 60 secondsRename the Practice sheet to Quarterly Plan. Do not change any values.
Step-by-step
Open the practice sheetUse the example data shown below so the result is easy to check.
Rename a sheetRename the Practice sheet to Quarterly Plan. Do not change any values.
Check the resultCompare the finished sheet with the expected result and correct the target range if needed.
Shortcut or faster method
Use the menu path shown in the video and keep the target range selected until the change is applied.
Expected result
A sheet named Quarterly Plan exists.
Common mistake
Changing the source values while applying the formatting or structure change.
Troubleshooting
Undo the last change, reselect the intended range, and try again. A sheet named Quarterly Plan exists.
Example spreadsheet data
This is the clean fixture used for the verified run.
| Quarter | Revenue |
| Q1 | 120 |
| Q2 | 180 |
| Q3 | 240 |
Video transcript
- Open the prepared Practice spreadsheet.
- Open the practice sheet. Use the example data shown below so the result is easy to check.
- Rename a sheet. Rename the Practice sheet to Quarterly Plan. Do not change any values.
- Check the result. Compare the finished sheet with the expected result and correct the target range if needed.
- A sheet named Quarterly Plan exists.